CREA – Consiglio per la Ricerca in Agricoltura e l'Analisi dell'Economia Agraria
- LIFE Project FutureForCoppiceS (LIFE14ENV/IT/000514) “Shaping future forestry for sustainable coppices in Southern Europe: the legacy of past management trials”. Action B.8 - Modeling and spatialization of data. Years 2016-2019.
- LIFE Project FutureForCoppiceS (LIFE14ENV/IT/000514) “Shaping future forestry for sustainable coppices in Southern Europe: the legacy of past management trials”. Action B.9 - Synthesis and evaluation of data. Years 2016-2019.
University of South Africa - Dept. of Environmental Sciences
- Spatial analysis and mapping of lichen diversity of the town of Pretoria, South Africa. Year 2019.
- University of South Africa - Dept. of Environmental Sciences Lichen data analysis and feasibility study on the applicability of European method to the local situation of Pretoria, South Africa. Year 2018.
Arma dei Carabinieri – Comando Unità Forestali, Ambientali e Agroalimentari (CUFAA)
- LIFE Project SMART4Action (LIFE13 ENV/IT000813) “Sustainable Monitoring And Reporting To Inform Forest- and Environmental Awareness and Protection” - Action B.4 “Synthesis of information and participative design of the new system”. Years 2017-2018.
- LIFE Project SMART4Action (LIFE13 ENV/IT000813) “Sustainable Monitoring And Reporting To Inform Forest- and Environmental Awareness and Protection” - Action B.1 “Analysis, evaluation and testing of forest ecosystems biological response”. Years 2017-2018.
ILVA SpA in amministrazione straordinaria
- Integrated elaboration of the data collected within bioindication and bioaccumulation networks (2014 and 2016 surveys). Prescrizione AIA N. 93. Years 2017-2018.
- Biomonitoring network to assess bioaccumulation of PCDD/F, PAH, and PCB in Brassica plants and pine needles in the surroundings of the ILVA steelworks in Taranto. Years 2015-2018.
Fondazione Edmund Mach - IASMA, Trento
- LIFE Project FutureForCoppiceS (LIFE14ENV/IT/000514) “Shaping future forestry for sustainable coppices in Southern Europe: the legacy of past management trials”. Action B.2 - Forest Ecosystem Health and Vitality. Years 2016-2018.
- Statistical analysis of the relationship between radial growth and defoliation of the plants of the 1st and 2nd level to highlight the relationship's presence and significance. Year 2015.
- Analysis and decomposition of time series of 20 different pollen taxa in the seasonal, cyclical, trend, and residual components (deterministic models and stationary analysis). Use of serial self-correlation diagnostics. Exploration of stochastic self-regressive, Arma or Arima models. Years 2013-2014.
- Development of self-regressive stochastic models for pollen data analysis. Year 2013.
- Evaluation of sources of variability of chlorophyll a fluorescence data in Norway spruce trees. Year 2013.
- Implementation of models for explanatory purposes on the day of start of flowering for 3-5 taxa pollens to be developed using linear and non-linear mulivariate statistical techniques. Year 2013.
- Ozone and population in Trentino (N Italy): exposure extimates. Finalizing ozone EFFORT project and data improvement. Year 2012.
- Design and data processing for the 2010 survey on ozone pollution. Years 2009-2011.
- Monitoring and biomonitoring of ozone effects in Trento Province. Years 2007-2011.
- Calculation of the parameters of ozone exposure (AOT40) and processing potential risk maps from data collected in the study sites of Viburnum. Years 2008-2010.
Ministero delle Politiche Agricole Alimentari e Forestali - Corpo Forestale dello Stato
- LIFE Project SMART4Action (LIFE13 ENV/IT000813) “Sustainable Monitoring And Reporting To Inform Forest- and Environmental Awareness and Protection” - Action B.4 “Synthesis of information and participative design of the new system”. Years 2015-2016.
- LIFE Project SMART4Action (LIFE13 ENV/IT000813) “Sustainable Monitoring And Reporting To Inform Forest- and Environmental Awareness and Protection” - Action B.1 “Analysis, evaluation and testing of forest ecosystems biological response”. Years 2015-2016.
- Integrated evaluation of the data collected during the year 2013 also in relation to the data of the relative time series related to the CONECOFOR Program. Year 2013.
- LIFE Project Futmon (LIFE07 ENV/D/000218) "Further Development and Implementation of an EU-level Forest Monitoring System” - Management and integrated processing of data collected on Level II areas. Action FutMon IM - 15(IT). Years 2009-2010.
Consiglio Nazionale delle Ricerche
- Integrated and long-term analysis of monitoring data to study the functionality of forest ecosystems, feasability study on the integration among research and monitoring networks on italian forest ecosystems and optimization criteria of the current monitoring network. Years 2014-2015.
- Integrated processing of CONECOFOR data regarding the relationship between tree growth and environmental factors. Year 2013.
- Data processing of the European network ICP-Forests: assessment of the distribution of forest damages expected to be caused by nitrogen deposition and assessment of their causes. Year 2012.
Office National des Forêts, RENECOFOR, France
- Relationship between forest health and growth at the RENECOFOR plots. Years 2012-2013.
- Analysis of Forest Health data from the RENECOFOR plots. Part 3. Change and Trend Analysis. Year 2011.
- Change and trend and correlative study of defoliation data from the RENECOFOR plots. Anno 2010.
- Identification of changes of the condition of the RENECOFOR plots due to environmental stressors – A proposal for a feasibility study. Anno 2009.